education structures PROJECT 

Trade Workshop

Temporary solution for Hornsby TAFE

Background

Hornsby TAFE needed a temporary teaching facility to increase onsite capacity for delivering Construction classes. The biggest challenge was the uneven surface of the site. FloorStak flooring system was used for immediate support.

Solution

L Series structure with a partial mezzanine was chosen measuring 25.00m wide x 40.00m in length on a 6.20m side height. A Charcoal and White Thermo-inflated roofing system was installed to minimise internal condensation and provide insulation. 60mm insulated sandwich walling panels were fitted with an 8.00m roller shutter door and polycarbonate and louvre windows.

The TAFE increased classroom space, with a structure that is easy to dismantle and relocate.