top of page

Hornsby TAFE Teaching Facility

  • daniellaATS
  • Mar 20
  • 2 min read

High-Compliance, Rapid-Deployment Temporary Teaching Facility


The North Sydney Institute of TAFE required a custom-built, temporary teaching facility that met strict compliance and operational needs while being delivered within a short timeframe and tight budget. Australian Temporary Structures was tasked with designing and installing a modular educational facility that adhered to the Building Code of Australia's ‘High-Class Building’ regulations and satisfied the needs of multiple stakeholders.


This project presented unique challenges, including compliance with strict building codes, minimal site impact, and rapid deployment, all while maintaining functionality and a professional learning environment.


Hornsby TAFE Workshop
Hornsby TAFE Workshop Built on Campus Car Park

Teaching Facility Project Overview


Location: North Sydney Institute of TAFE, Hornsby

Structure Dimensions: 25.00m x 40.00m with Mezzanine

Primary Use: Temporary educational facility for TAFE training

Key Challenges: Building Code compliance, minimal site impact, multiple stakeholder requirements

 


Hornsby TAFE woodworking workshop
Hornsby TAFE Capentry Skills Workshop

Key Features & Customisations

 

  • Fully Compliant with High-Class Building Standards – Engineered to meet strict safety, accessibility, and durability standards for public learning institutions.

  • Rapid Installation – Designed for fast deployment, ensuring students and faculty could resume learning with minimal disruption.

  • Minimal Impact on Existing Buildings & Grounds – Constructed with non-invasive anchoring methods, preserving the integrity of the site.

  • Mezzanine Level for Optimised Space Utilisation – Created additional learning and workspace, enhancing teaching flexibility and classroom functionality.

  • Durable & Weather-Resistant Construction – Provided a comfortable, climate-controlled environment for students and staff.

  • Custom Interior Layouts – Adapted to educational requirements, including classrooms, faculty offices, and student facilities.

 

Project Success


The Hornsby TAFE Project showcased how ATS light industrial buildings can be adapted for high-compliance educational applications while maintaining fast deployment, cost-efficiency, and minimal environmental impact. By incorporating a modular, scalable design, this facility provided TAFE students and instructors with a high-quality, functional learning space that met both regulatory and operational requirements.


This teaching facility project reinforces ATS’s capability in delivering custom modular structures for education, government, and high-regulation industries, ensuring functionality, compliance, and efficiency in every build.




Comentários


Não é mais possível comentar esta publicação. Contate o proprietário do site para mais informações.

Request a Quote

bottom of page